Flexi leads are small wonders in their own right – packed with innovative ideas, patented technology and handcrafted details. Each model is assembled by hand and undergoes various quality checks before your tail-wagger actually gets to use it. Handmade in Germany since 1972, Flexi Leads are the original retractable lead and are tested to the limits to ensure that they can support even the most vivacious dogs throughout their lives. Flexi braking systems are not only intuitive and smooth, they also react in the split of a second. Thanks to the tape guidance system, which has been perfected through countless tests, the tapes can be extended in all directions without getting jammed.
- 3 m tape lead
- For little dogs, cats and other small animals up to max. 12 kg

- Pocket-format
- Comfortable braking system
- Soft grip
- Product weight: 120 g approx.
For your pet’s safety, examine the lead regularly for signs of wear and tear and replace when appropriate, remembering also that pets can chew items unexpectedly, and if any material is ingested to seek immediate veterinary advice.














Reviews
There are no reviews yet.